Between Turkey day, work and house projects not a lot.....
Dropped a large box of parts at the plater last week to be stripped and re-plated in bright zinc. I asked them to bake teh lot to eliminate hydrogen embrittlement which is an unfortunate side effect of the plating process. I spoke to the plater yesterday and he told me he'll have to do some as barrel and some on wires.
Hopefully that will come back soon.
I just ordered throttle cables and a replacement intake rubber for the one that the fairies hid. I was going to make the cables but the top ends were too far gone.
I should really chrome plate the foot brake and gear shift levers but I can't bring myself to put chrome on this bike - there's already too much bling for a pseudo race bike.
The rear axle was drilled out but I want a bigger hole, so I bought a long drill and now I need to learn how to dill a 12" deep hole 5/16" diameter without breaking something or getting the drill off center. Long drills get hot and walk off line very easily.
Dave - did you spot the kickstart lever?

Must save at least a couple of grams.
