Absolutely stunning amount of work on this 750
Moderators: oldjapanesebikes, H2RICK, Suzsmokeyallan
-
- AMA Superbike
- Posts: 1681
- Joined: Tue Jul 24, 2012 11:45 pm
- Country: U.S.
- Suzuki 2-Strokes: 75- GT 550 / 76- GT 750
- Location: SW PA
Absolutely stunning amount of work on this 750
This guy took so long to show every angle, seems as if he was afraid to start it. Lol ! For it may expel a few fumes on it. There must be over 20k into this bike. But, tach shows only 66 miles. Sorry, if it's a repost. http://www.youtube.com/watch?v=qT6VEeZ1GdU" onclick="window.open(this.href);return false;"
- celt_rock
- To the on ramp
- Posts: 270
- Joined: Tue Aug 07, 2012 10:31 pm
- Country: USA
- Suzuki 2-Strokes: T500, GT380, GS400
- Location: Northern Vermont
Re: Absolutely stunning amount of work on this 750
That's some of the most careful camera work I've seen. He must be REAL proud of her, she's GLEAMING! He even goes back around in case you missed it the first time... it's prettier than when it rolled off the showroom floor.
Slow and steady may win the race, but without loud and fast it's just a waste
- Suzukidave
- Moto GP
- Posts: 3980
- Joined: Fri Oct 24, 2008 5:55 pm
- Country: US
- Suzuki 2-Strokes: GT750 x2 97 -1200 Bandit 86 GSXR1100
- Location: Lancaster Pa.
Re: Absolutely stunning amount of work on this 750
Its a very nice job alright ..but i wondered why after all the detail work he went custom on the paint work ...
the older i get the faster i was
-
- AMA Superbike
- Posts: 1681
- Joined: Tue Jul 24, 2012 11:45 pm
- Country: U.S.
- Suzuki 2-Strokes: 75- GT 550 / 76- GT 750
- Location: SW PA
Re: Absolutely stunning amount of work on this 750
My same thoughts. Don't get me wrong, it's absolutely stunning. But, the tank and side covers look ghetto.Suzukidave wrote:Its a very nice job alright ..but i wondered why after all the detail work he went custom on the paint work ...
-
- On the street
- Posts: 35
- Joined: Mon Oct 12, 2015 12:53 pm
- Country: USA
- Suzuki 2-Strokes: 1973 GT550
Re: Absolutely stunning amount of work on this 750
That much work to put a crappy stencil job on the tank. wow...
-
- Road race school
- Posts: 841
- Joined: Tue Feb 19, 2013 2:45 am
- Country: Australia
- Suzuki 2-Strokes: Suzuki GT750A 1976
- Location: Sydney New South Wales
Re: Absolutely stunning amount of work on this 750
Hi,yes the paint work & lack of badges really spoil an otherwise nice bike,little things wrong here & there,the lack of rubber dust caps for the front brake bleed nipples & warning decals missing etc His bike,so he can have it anyway he wants
Cheers,
Roger
Cheers,
Roger
GT750Battleship.